Real-time industrial HMI and SCADA development
A well-designed HMI/SCADA turns process data into operating decisions. Proctek develops real-time interfaces and SCADA platforms under high-performance HMI standards and ISA-18.2 rational alarm management, integrated with the plant's existing DCS, PLC and historians.
No commitment · We reply within 24 hours
What this service includes
- High-performance HMI interface design and development
- Real-time SCADA platform implementation
- Alarm management systems under ISA-18.2
- Integration with existing DCS, PLC and historians
- Historical data and trend management
- Electrical SCADA for substations
Why Proctek
Who this is for
Automation Engineers · Operations Superintendents · Control Room Supervisors
Frequently asked questions
Can you integrate the new SCADA with our current DCS and PLC?
Yes. We work with standard industrial protocols (OPC UA, Modbus, Ethernet/IP, Profinet, DNP3, IEC 61850) and native drivers from major manufacturers, so the SCADA integrates on top of the existing control infrastructure without replacing it.
What is a high-performance HMI and why does it matter?
It is a design philosophy (ISA-101) that prioritizes fast visual detection of abnormality: sober displays, information hierarchy and color used only for the abnormal. It reduces operator response time and errors under demanding process conditions.
How do you handle cascading alarms?
We apply rational alarm management under ISA-18.2: alarm census and rationalization, consequence-based prioritization, state-based suppression and master documentation. The goal is that every alarm the operator sees requires a real action.
Ready to discuss your project?
Tell us about your operation and an engineer from the area will get back to you.
Talk to an engineer